The project consists of two parcels of 5.78 hectares and 7.86 hectares. With the rise in land cost and cost of construction, a large segment of population is left without owning a decent place to live.
This project Is a challenge from the clients to reduce the construction cost to the minimum while creating a decent environment for living. In order to achieve this goal a whole new mind-set is required for planning, designing, material selection, detailing and In construction techniques.
At macro level a single building module is developed to achieve the targeted budget while at micro there are same kitchen, toilet, staircase and balcony details almost through the project are implemented. This ensures a substantial saving in cost and time.
Buildings are kept to the best suitable height to achieve the full FAR with pleasing open spaces around.